Project data t1 d, Y8 z) @ u& U
Location: Dresden, Germany 7 x- O J7 n, E0 d$ m
arched bridge over the river Elbe * g( [% d% K0 x- U' p; k
structure: arched bridge with four lanes, plus pedestrian and cycle paths 6 c& v X9 V% c' M
superstructure in steel composite construction method , e: {4 E4 M3 F. O* r- }+ K
overall length: 635 m ( c% |9 C. T1 d: G
standard cross-section width: 28 m 8 Y4 C( P; j7 \4 `2 V1 \
span of steel arches: 148 m 3 m: Z ~. ~2 J0 V2 D( x6 z
construction period: 2007 – 2012 4 ~ D/ T* ]- v: ?+ t- i6 a* @- z, D